Q3 2024 Production Report

KAZ MINERALS PRODUCTION AND SALES REPORT FOR NINE MONTHS AND THE THIRD QUARTER ENDED 30 September 2024

 

 

9m
2024

9m
2023

 

Q3 2024

Q2 2024

Q3 2023

Copper production1

kt

 287.0

 301.2

 

 96.1

 96.6

 101.7

Aktogay

kt

 172.2

 192.0

 

 58.3

 58.3

 65.4

Bozshakol

kt

 79.2

 77.5

 

 25.8

 26.3

 27.3

East Region & Bozymchak

kt

 35.6

 31.7

 

 12.0

 12.0

 9.0

Gold production2

koz

 110.9

 120.3

 

 35.0

 36.7

 42.4

Silver production2

koz

 2,750

 3,004

 

 875

 997

 1,026

Zinc in concentrate

kt

 31.3

 36.4

 

 8.8

 12.0

 12.5

Copper sales3

kt

 295.0

 344.2

 

 91.9

 99.9

 121.1

Gold sales4

koz

 120.4

 140.6

 

 36.4

 39.7

 47.7

Silver sales4

koz

 3,014

 3,191

 

 1 126

 922

 1,158

Zinc in concentrate sales

kt

 35.7

 41.3

 

 10.4

 11.1

 12.1

1. Payable metal in concentrate and copper cathode from Aktogay oxide ore
2. Payable metal in concentrate
3. Payable metal in concentrate, toll processed metal and copper cathode from Aktogay oxide ore
4. Payable metal in concentrate and toll processed metal

Highlights

  • KAZ Minerals processed 72 Mt of ore in the first nine months of 2024, a 5% increase compared with the prior year comparative period (9m 2023: 68 Mt) and a record for the Group.
  • Copper production in the period decreased to 287 kt (9m 2023: 301 kt) as the increased ore throughput only partially mitigated the expected reduction in grades at both Aktogay and Bozshakol.
  • Gold, silver and zinc in concentrate by-product output reduced versus the prior year comparative period as mining at the East Region and Bozymchak took place in areas with lower polymetallic content.
  • Copper sales of 295 kt were 3% higher than production as the Group sold finished goods inventories which were in transit at the end of the previous year.

Andrew Southam, Chief Executive Officer, said: “KAZ Minerals’ continued focus on maximising ore throughput enabled the concentrators at Aktogay, Bozshakol and Bozymchak to exceed design capacity, achieving record processing volumes in the first nine months of 2024. This excellent operational performance enabled the Group to produce 287 kt of copper in the period.”

For further information please contact:

KAZ Minerals

 

 

Maksut Zhapabayev

Gillian Little

Corporate Communications, Almaty

Company Secretary, Dubai

Tel: +7 727 244 03 53

Tel: +971 4 560 5100

REGISTERED OFFICE

Unit No: 3402, Platinum Tower, Plot No: JLT-PH1-I2, Jumeirah Lakes Towers, Dubai, United Arab Emirates

PLEASE FOLLOW THIS LINK TO DOWNLOAD THE FULL ANNOUNCEMENT 

 

 

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.